Bumpalot looks really quite amazing--the difference is wonderful. Mostly just paint and cleaning. We are really beginning to love it, despite its major problems.
- The gutters need to be fixed before winter. They're plastic and jointed and coming apart at the joints.
- The bathroom shower tile is unglazed, and the grout is not sealed. It is both coming out, and, worse than that, leaking through the drywall. That's right, drywall, not greenboard, which is supposed to be used in bathrooms. Top that off with the fact that on the other side of the wall that the shower in the master bathroom is on, there is a piece of furnace filter stuffed into a hole (crack) which goes straight into the garage. Nothing like a little carbon monoxide poisoning! Also, you can see the back of the drywall and how wet it is. in that space.
- The back of the house needs re-grading so that water doesn't run into the foundation.
- The floor in the utility room is warped, and will need to be pulled up and replaced.
1 comment:
The cabin is both ours and Mr. Bump's mother, Mrs. Bump, and Mr. Bump's brother, Mr. Bump. Please come!
Post a Comment